The construction area of the project is located in the east of the bay of Bengal, and the main works include: a single point mooring system (SPM), including subsea manifold; pipeline station and tank farm (PSTF), including crude oil tanks and diesel tanks with a net capacity of 240000 cubic meters; two 36 inch onshore and subsea concomitant oil pipelines from SPM to PSTF; two 18 inch onshore and subsea concomitant oil pipelines from PSTF to refinery; three block valve chambers; SCADA and communication system.The contract period of the project is 36 months and the contract amount is 550.4 million US dollars.After the completion of the project, the unloading time of 100000 tons of crude oil can be shortened from 11 days to 2.5 days, which can avoid environmental pollution caused by crude oil leakage, reduce the loss caused by crude oil transportation, and save 120 million US dollars per year.This project is of great significance to the implementation of “the Belt and Road” initiative and the construction of “Bangladesh China India Myanmar” economic corridor.
东非原油管道项目
Beijing Gas Tianjin Nangang LNG Emergency Reserve Project Export Pipeline Project
Hebei Xintian Tangshan LNG Receiving Station Export Pipeline Project
Comprehensive Operation and Maintenance Technical Service Project of Machine Room and Weak Current System on the 8th Floor of PetroChina Shanghai Buil
Jiangsu Binhai LNG Project
Tangshan LNG Communication System Project
No. 1 Gas Plant 2021 Gas Field Productivity Construction Project No. 1 Purification Plant Produced Water Treatment System Relocation Project
Equipment installation and maintenance services for the fracturing flowback fluid and production water treatment project of CNOOC Tianjin Chemical Res
Niger Benin Oil Pipeline Project
Construction of Off Station Gathering and Transmission System of Wenjisang Gas Storage Qunwenxi No.1 Reservoir Surface Engineering