筑巢东非热点工程

最新现场图景显示,东非原油管道(EACOP)项目关键营地建设正有条不紊地展开。镜头聚焦之处,是营地搭建工作的扎实进展。

平整开阔的土地上,营区轮廓已清晰勾勒。工程人员专注地进行着营房基础施工、结构安装与内部功能区划分。一排排营房框架拔地而起,生活区、办公区等模块化单元正在高效组装,营地雏形日益显现。
![]()



作为连接乌干达与坦桑尼亚的能源大动脉,EACOP的每一步进展都牵动人心。当前营地的高效建设,正是这条未来“能源纽带”稳固扎根的重要标志。从无到有,这片土地正因营地的落成而焕发新生机,静待管道建设全面铺开。

The weather is cool and it's a fine autumn; September is only suitable for traveling.
Night Battle on the Great River | Water levels are rising, pipelines are extending
The summer colors fade in the clouds and sky; the pipes welcome the sounds of autumn.
The hot connection has been successfully completed, and the well cluster is about to be put into production.
Practical drills to prevent heatstroke, building a solid safety line for summer
An oil worker who has taken off the military uniform is still a soldier at heart.
Sweat-soaked workwear is the simplest answer to this summer.
The temperature is 40°C, the welding sparks are 1500°C, how "fiery" is the summer for workers?
July 1st | The direction of light is also the path we have walked.
EACOP Uganda Section: Over the Great River, the pipeline is crossing.